Featured Projects

Current Projects

Corridor K (A-0009C) Robbinsville-Stecoah

Due to COVID-19, NCDOT is not holding in-person public meetings for projects.   Virtual public meetings and hearings are being held until further notice.  A virtual public hearing...

P-5750: Polkton Rail Siding Extension

 Project Overview:The N.C. Department of Transportation Rail Division proposes to extend the existing rail siding in Polkton approx. 14,000 feet to the west, to just east of the bridge at Boston Avenue...

I-6064: I-95-Lumberton

 The proposed project involves improving a 9.0-mile segment of I-95 between I-74 (Exit 13) and U.S. 301/Fayetteville Road (Exit 22) in Robeson County.  Proposed improvements...

R-5930: North Chatham Park Way

The N.C. Department of Transportation, in partnership with the Town of Pittsboro and Chatham Park Developers, proposes to construct a new north-south roadway east of Pittsboro called North Chatham...

planned
planned
Where's my CSS

Answer 1

planned
planned
Question

Answer

I-5986A: I-95 Widening North of Fayetteville

NCDOT plans to widen I-95 from four lanes to eight lanes and make other upgrades stretching from I-95 Business/U.S. 301 (Exit 56) to I-40 (Exit 81), a length of 26 miles within Cumberland,...

19
23
planned
planned
Where's my CSS

Answer 1

planned
planned
Question

Answer

P-5740: Wilmington "Beltline" Improvements

The project proposes improvements to approximately 13 miles of the CSX SE Rail Line (the "Beltline") from CSX Davis Yard in Navassa to S. Second Street in Wilmington, Brunswick, and...

16
21
planned
planned
Where's my CSS

Answer 1

planned
planned
Question

Answer

P-5709/Y-5500GA-Franklin Blvd -Naco Rd -Greensboro

Preliminary Engineering Activities for this projecthave been suspended. The North Carolina Department of Transportation proposes;Project P-5709 to grade separate Franklin Boulevard and close O’Ferrell...

U-6018: N.C. 62 Archdale

Preliminary Engineering Activities for this projecthave resumed. The N.C. Department of Transportation is proposing to make improvements near the I-85//N.C. 62 interchange in Archdale.  The project...

11
20

U-6024/R-3608 US 401-NC 39 - Louisburg

Preliminary Engineering Activities for this projecthave been suspended.The North Carolina Department of Transportation is proposing two adjacent roadway improvement projects, U-6024 and R-3608.U-6024 would...

44
74

P-5725: Kannapolis Train Station Improvements

The project involves the proposed  construction of a second passenger rail platform and pedestrian overpass at the Kannapolis Train Station in Cabarrus County. Proposed improvements...

W-5706S: U.S. 74/76 Improvements

​Preliminary Engineering Activities for this projecthave been suspended. The project proposes improvements to U.S. 74/76 from Byrdville Freeman Road (S.R. 1836) to east of Money Hole Road...

U-3415A: Poplar Tent Road - Widening/Intersection Improvements

Preliminary Engineering Activities for this projecthave been suspended. The proposed project involves the proposed widening improvements to Poplar Tent Road (S.R. 1394) from a two-lane roadway to...

86
117

R-2577A-US158-Walkertown-area

The North Carolina Department of Transportation proposes to improve U.S.158 (Reidsville Road) from multi-lanes north of U.S. 421/I-40 Business to Belews Creek Road (S.R. 1965) in Forsyth County. The project,...

BR-0026: Replacement of Bridge No. 50 on N.C. 210 over Middle Creek

Preliminary Engineering Activities for this projecthave been suspended.  The N.C. Department of Transportation proposes to replace Bridge No. 50 on N.C. 210 over Middle Creek in Johnston County. The...

W-5808B (W-5517) U.S. 421 and N.C. 902 - Bear Creek

Preliminary Engineering Activities for this projecthave been suspended.The NC Department of Transportation is proposing to upgrade the intersection of U.S. 421 and N.C. 902 to a reduced conflict intersection...

U-5934: NC-147-Widening-Durham

​Preliminary Engineering Activities for this projecthave been suspended. The NC Department of Transportation Planning is underway to widen and improve N.C. 147 (Durham Freeway) between Interstate...

R-2553: Kinston Bypass

Preliminary engineering activities for this projecthave resumed. Read more​.​​​ The proposed Kinston Bypass would be a four-lane, median divided freeway (accessible via ramps at interchanges) that...

42
37

U-6042: 33rd and 34th in Long View

Preliminary Engineering Activities for this projecthave been suspended.The N.C. Department of Transportation proposes the realignment of the offset intersection of 33rd Street SW (S.R. 1124) and 34th Street...

U-5766 Steele Creek Road Improvements

 â€‹Preliminary Engineering Activities for this projecthave been suspended. The North Carolina Department of Transportation proposes to widen N.C. 160 (Steele Creek Road) from the South Carolina...

154
235

U-5939-U.S. 17-Oak Stump Road

Preliminary Engineering Activities for this projecthave been suspended.The N.C. Department of Transportation proposes to improve the intersection of U.S. 17 and Oak Stump Road (S.R. 1145) in Pasquotank...

12
19

U-6065: U.S. 17 / N.C. 172 Intersection Improvements

Preliminary Engineering Activities for this projecthave been suspended.The N.C. Department of Transportation proposes to improve the intersections of U.S. 17 / N.C. 172 and U.S. 17 / Old Folkstone Road....

U-4434: Independence Boulevard Extensiton

Preliminary Engineering Activities for this projecthave been suspended. This project proposes to extend Independence Boulevard (S.R. 1209) by 1.7 miles from Randall Parkway to U.S. 74 (Martin Luther King...

W-5706N: N.C. 710-Deep Branch Rd

Preliminary Engineering Activities for this projecthave been suspendedThe NC Department of Transportation is proposing to construct a roundabout at the intersection of N.C. 710 and Deep Branch Road (S.R....

U-5536 Great Wagon Road

Preliminary Engineering Activities for this projecthave been suspended. The N.C. Department of Transportation is preparing environmental documents and engineering designs for the proposed extension...

13
23

R-5759: NC115-N-Wilkesboro

The NC Department of Transportation is proposing to widen N.C. 115 from U.S. 421 to 2nd Street in North Wilkesboro.  State Transportation Improvement Program (STIP) Project No....

W-5703H: U.S. 17 and Hickman Road NW Intersection Improvements

Preliminary Engineering Activities for this projecthave been suspended.The N.C. Department of Transportation has begun studies of safety and operational improvements at the intersection of U.S. 17...

R-5851: US17andNC904

Preliminary Engineering Activities for this projecthave been suspended.  The NC Department of Transportation is proposing to convert intersection at U.S. 17 and N.C. 904 to a reduced conflict...

68
72

P-5713: Hilltop Road Rail Crossing

Preliminary Engineering Activities for this projecthave been suspended. The proposed project involves constructing a grade separation (bridge) at the Hilltop Road (S.R. 1424) railroad crossing of the North...

25
21

I-5987: I-95 Widening

  The proposed project involves widening an 18.7-mile segment of I-95 between U.S. 301/Fayetteville Road (Exit 22) in Robeson County and I-95 Business/U.S. 301 (Exit 40) in Cumberland County. The...

U-6021: Fayetteville Road

​Preliminary Engineering Activities for this projecthave been suspended.​​​ The N.C. Department of Transportation and the City of Durham are proposing to widen Fayetteville Road (S.R. 1118) from a...

395
374

R-5724: US-15-501-Pittsboro

​Preliminary Engineering Activities for Section A of this project have resumed The proposed project involves widening approximately 1.4 miles of U.S. 15-501 (Hillsboro Street) from Launis Street...

43
23

R-5777C: Havelock Bypass To Thurman Road

To Skip Directly To The Comment Section Click HereThe N.C. Department of Transportation is proposing to upgrade a section of US 70 Improvements from the Havelock Bypass to East of Thurman Road (S.R....

20
19

U-5890: Dabney Drive Upgrade

​Preliminary Engineering Activities for this projecthave been suspended. The NC Department of Transportation is proposing to upgrade Dabney Drive (S.R. 1162) from Coble Boulevard to U.S. 158 Business in...

55
21

R-5857: U.S. 17 Intersection Improvements near Shallotte

​Preliminary Engineering Activities for this projecthave been suspended.​​​ The N.C. Department of Transportation proposes intersection improvements at the intersection of U.S. 17 at U.S. 17...

11
12

R-5709: N.C. 211 - Aberdeen to Raeford

The N.C. Department of Transportation proposes to widen N.C. 211 to a four-lane road divided by a grass median from U.S. 15-501 in Aberdeen (Moore County) to West Palmer Street (S.R. 1244) - Mockingbird...

50
71

U-5864: Surrett Drive Widening

​Preliminary Engineering Activities for this projecthave been suspended. The N.C. Department of Transportation is proposing to widen Surrett Drive (S.R. 1595/ S.R. 4053) from I-85 in Randolph County...

R-5705: NC 55 Corridor

Preliminary Engineering Activities for this projecthave been suspended. Currently, N.C. 55 is primarily a two-lane roadway throughout the project corridor, with turn lanes at major intersections. To relieve...

U-6008: Bryan Boulevard Interchange Improvements

Preliminary Engineering Activities for this projecthave been suspended.The N.C. Department of Transportation and the City of Greensboro will hold a public meeting regarding the proposed interchange improvements...

U-5932: U.S. 17 at N.C. 211 Intersection to Interchange

​Preliminary Engineering Activities for this projecthave been suspended.The N.C. Department of Transportation is proposing improvements to the U.S. 17 (Ocean Highway)/N.C. 211 (Southport Supply Road Southeast)...

R-2522: U.S. 21 (N. Main Street) Improvements

Preliminary Engineering Activities for this projecthave been suspended.The N.C. Department of Transportation is proposing to widen approximately 1.7 miles of U.S. 21 (N. Main Street) from Cedar Lane...

U-5891: NC 50 (Creedmoor Road)

Preliminary Engineering Activities for this projecthave been suspended. The N.C. Department of Transportation is proposing to widen N.C. 50 from I-540 to north of N.C. 98. N.C. 50 is a two-lane highway...

1,168
402

I-5712: I-40/Sandy Ridge Road Interchange

Preliminary Engineering Activities for this projecthave been suspended.The proposed project involves improving the I-40/SandyRidge Road (S.R. 1850) interchange in Guilford County. Sandy Ridge Road and...

I-5701/5703: 40-440-U.S.1 Interchange

Preliminary Engineering Activities for this projecthave been suspended. NCDOT is working on two projects to improve traffic along I-40 at the I-40/I-440/U.S. 1/U.S. 64 interchange.   Project...

138
187

I-5970: I-440 - Capital Boulevard Interchange

Preliminary Engineering Activities for this projecthave been suspended. The N.C. Department of Transportation is proposing to reconfigure the interchange on I-440 at Capital Boulevard in northeast...

19
42

U-5811: Aviation Parkway

Preliminary Engineering Activities for this projecthave been suspended. This project proposes to widen approximately 2.2 miles of Aviation Parkway (S.R. 1002) from N.C. 54 (Chapel Hill Road) in Morrisville...

210
259

U-4739: Amboy and Meadow

​Preliminary Engineering Activities for this projecthave been suspended.​​​ Planning and development are underway on a proposed project to widen approximately 2.6 miles of Amboy from a two-lane roadway...

37
17

U-5991: N.C. 43 (Charles Blvd)

Preliminary Engineering Activities for this projecthave been suspended. Planning and development are underway to improve approximately 3 miles of N.C. 43 (Charles Boulevard) from a two-lane roadway...

105
33

U-6107: U.S. 17 Intersection Improvements

Preliminary Engineering Activities for this projecthave been suspended.The NC Department of Transportation is proposing to improve intersection on U.S. 17 at McDaniel Drive / Workshop Lane in Onslow County. ...

Cape Fear Crossing

  The Cape Fear Crossing is an approximately 9.5-mile proposed road and bridge over the Cape Fear River that would help improve traffic flow and enhance freight movements from U.S. 17 and I-140 in...

1,503
697

U-5768: N.C. 49 Widening

Preliminary Engineering Activities for this projecthave been suspended. The N.C. 49 Widening and Back Creek Church Road Realignment project is a joint project between the N.C. Department of Transportation and...

Hoke County - Rockfish Area

​Preliminary engineering activities for projects U-5753, U-5858, U-5798, U-5707 have been temporarily suspendedActivities for U-5857 have resumed.  PROJECT DESCRIPTIONThe N.C. Department...

I-3306A: I-40 Widening - Orange County

Preliminary Engineering Activities for this projecthave been suspended.  The N.C. Department of Transportation is proposing the widening of 11.4 miles of I-40 between I-85 and the Durham County...

22
25

I-4409: I-40 and Blue Ridge-Black Mountain

Preliminary Engineering Activities for this projecthave been suspended.The N.C. Department of Transportation proposes to construct a new interchange at Interstate 40 and Blue Ridge Road in Black Mountain. ...

U-5746: U.S. 401 at Ten-Ten Road

The N.C. Department of Transportation is proposing to widen U.S. 401 to a six-lane median divided typical section between W. Allen Street (S.R. 1467) /E. Allen Street (S.R. 2839) and Ten-Ten Road (S.R....

U-5720: U.S. 70 Durham

​Preliminary Engineering Activities for this projecthave been suspended.The N.C. Department of Transportation is proposing to convert U.S. 70 to a Controlled Access Roadway from Lynn Road in...

117
128

C-5621: U.S. 21 Statesville Road and Catawba Avenue

Preliminary Engineering Activities for this projecthave been suspended.  The N.C. Department of Transportation proposes to add additional lanes on Catawba Avenue from U.S. 21/ Statesville Road to...

U-5302: U.S. 401 - Garner

​Preliminary Engineering Activities for this projecthave resumed.​​​ The N.C. Department of Transportation is proposing to convert 1.2 miles of U.S. 401 from south of Legend Road to U.S....

U-5769: N.C. 16 (Providence Road)

​Preliminary Engineering Activities for this projecthave been suspended. The N.C. Department of Transportation is proposing to make improvements to N.C. 16 (Providence Road South) between Rea Road...

49
40

U-5307: U.S. 1 (Capital Boulevard)

​Preliminary Engineering Activities for this projecthave been suspended. Planning and development is underway on a proposed project to convert U.S. 1 (Capital Boulevard) to a controlled-access highway...

147
205

Division of Aviation: UAS Integration Pilot Program Community Survey

In May 2018, the Federal Aviation Administration selected the N.C. Department of Transportation as one of 10 participants in its Unmanned Aircraft Systems (UAS) Integration Pilot Program. Through this...

1,806
1,855

U-5973: U.S. 19/Weaverville Hwy and New Stock Road

Preliminary Engineering Activities for this projecthave been suspended.Project DescriptionThe N.C. Department of Transportation proposes to improve the intersection of U.S. 19 Business (Weaverville...

35
30

U-5969: U.S. 501/Madison - Roxboro

​Preliminary Engineering Activities for this projecthave been suspended.NCDOT is proposing to convert U.S. 501 (Madison Boulevard) from a 5-lane undivided roadway to a 4-lane median divided roadway from...

186
148

I-485 and U.S. 74 Express Lanes Network

              WHAT'S NEW?Elm Lane to be Closed August 31, 2020As part of the ongoing construction for the I-485 express lanes and other corridor improvements,...

1,357
1,943

College Road: U-5704 and U-5790

PROJECT DESCRIPTIONU-5704Alternatives for upgrading N.C. 132 (College Road) and Oleander Drive intersection Alternatives being evaluated for this project include: Alternative A     Quadrant...

37
42

U-5750: N.C. 54 Widening Shiloh Glenn to Perimeter Park

Proposed widening of N.C. 54 from Shiloh Glenn Drive to Perimeter Park Drive in Morrisville, Wake County

U-5892: Battleground

Preliminary Engineering Activities for this projecthave been suspended. PROJECT DESCRIPTIONThis project proposes to widen approximately 1.5 miles of U.S. 220 (Battleground Avenue) from north of Westridge...

123
78

College Road: U-5881 and U-5792

PROJECT DESCRIPTIONU-5881Alternatives for upgrading N.C. 132 (College Road) from Gordon Road to New Centre Drive are being studied.Improvements associated with this project include:Additional thru and...

24
24

College Road: U-5702A and U-5702B

PROJECT DESCRIPTIONU-5702AAlternatives for upgrading N.C. 132 (College Road) from New Centre Drive to just south of U.S. 117 (Shipyard Boulevard) are being studied.Improvements associated with this project...

Rail Projects

The N.C. Department of Transportation is proposing to close the existing at-grade railroad crossings of Glover Road, Wrenn Road, and Ellis Road along the North Carolina Railroad Company NCRR corridor in...

FS-1501A: U.S. 17/Future I-87 - Feasibility Study

PROJECT DESCRIPTIONFeasibility Study of upgrading U.S. 17 beteen Williamston and the Virginia State Line to interstate standards.  A feasibility study is a preliminary analysis document.  It...

Complete 540 - Triangle Expressway SE Extension

PROJECT DESCRIPTIONFederal Aid Project Nos. STP-0540(19), STP-0540(20), and STP-0540(21)TIP Project Nos. R-2721, R-2828, & R-2829NCDOT and the Federal Highway Administration (FHWA) are proposing to...

87
36

R-5829A/B: U.S. 70 Goldsboro Bypass to Princeton

​Preliminary Engineering Activities for this projecthave been suspended. PROJECT DESCRIPTIONThe N.C. Department of Transportation is proposing to upgrade U.S. 70 to interstate standards from the U.S....

11
11

U-5301: U.S. 64 Improvements - U.S. 1 to Laura Duncan Road

​Preliminary Engineering Activities for this projecthave been suspended.​​PROJECT DESCRIPTIONThe N.C. Department of Transportation is investigating options for improving U.S. 64 from just west of Laura...

22
26

I-5700: Airport Blvd and I-40 Interchange Improvements

Preliminary Engineering Activities for this projecthave been suspended. PROJECT DESCRIPTIONThe N.C. Department of Transportation is proposing to revise the interchange at Airport Boulevard and I-40 and...

R-5721 / U-5765: N.C. 73 Improvements

​Preliminary Engineering Activities for this projecthave been suspended. Read more​.​​​ PROJECT DESCRIPTIONThe N.C. Department of Transportation is proposing to improve an 8.5-mile stretch of...

616
300

U-5825: Ten Ten Road (Apex and Cary)

​Preliminary Engineering Activities for this projecthave been suspended.PROJECT DESCRIPTIONNCDOT is proposing to widen Ten Ten Road from Apex Peakway in Apex to Kildaire Farm Road in Cary.  The primary...

233
206

U-5791: Jacksonville Parkway

​Preliminary Engineering Activities for this projecthave been suspended.​​​ PROJECT DESCRIPTIONThe N.C.  Department of Transportation is proposing to extend Jacksonville Parkway (S.R. 2714) from...

R-5813: Interchange Jim Sutton Road and Measley Road

​Preliminary Engineering Activities for this projecthave been suspended. PROJECT DESCRIPTIONThe N.C. Department of Transportation is proposing to upgrade a portion of U.S. 70 as a four-lane, median-divided...

U-4902B/C: U.S. 17 Business (Market Street) Improvements

Preliminary Engineering Activities for this projecthave been suspended. PROJECT DESCRIPTIONState Transportation Improvement Program Project No. U-4902 is an access management improvement project that proposes to...

U-5744: U.S. 70/N.C. 50 at Timber Drive/Hammond Road

​Preliminary Engineering Activities for this projecthave been suspended.PROJECT DESCRIPTIONThe N.C. Department of Transportation is proposing to upgrade the U.S. 70/N.C. 50 at-grade intersection with Hammond...

77
65

Moore County CTP

PROJECT DESCRIPTIONThe Moore County Comprehensive Transportation Plan is a long-range, multimodal vision covering all aspects of the county's transportation needs through the year 2040.  Development...

R-4463A: N.C. 43 Connector from U.S. 17 Business (Dr. Martin Luther King Jr. Boulevard) to South of U.S. 70/U.S. 17

PROJECT DESCRIPTIONNCDOT is proposing to construct the final phase of STIP Project No. R-4463.  This phase includes construction of N.C. 43 between U.S. 17 Business (Doctor M.L.K. Jr. Boulevard) and...

U-5876: Widening of U.S. 70 (Arendell Street)

​Preliminary Engineering Activities for this projecthave been suspended.PROJECT DESCRIPTION The N.C. Department of Transportation is proposing to widen U.S. 70 (Arendell Street) between 4th Street...

U-5717: U.S. 15-501 at Garrett Road

Preliminary Engineering Activities for this projecthave been suspended. PROJECT DESCRIPTIONThe N.C. Department of Transportation is proposing to improve U.S. 15-501 (Durham Chapel Hill Boulevard)...

R-5814: U.S. 258 Widening

​Preliminary Engineering Activities for this projecthave been suspended. PROJECT OVERVIEW AND PURPOSEThe N.C. Department of Transportation proposes to widen U.S. 258 from approximately 0.5 mile...

I-5870: I-440 at Glenwood Avenue

Preliminary Engineering Activities for this projecthave been suspended.​​​The Glenwood Avenue interchange on I-440 was originally built in the 1960s, upgraded in the early 1990s and cannot handle the volume...

309
651

U-5826: Falls Of Neuse

​Preliminary Engineering Activities for this projecthave resumed. PROJECT DESCRIPTIONThe N.C. Department of Transportation is proposing to Widen Falls of Neuse Road between I-540 and Durant Road in...

U-3618: Carey Road Extension

​Preliminary Engineering Activities for this projecthave been suspended.PROJECT DESCRIPTIONThe N.C. Department of Transportation is proposing to extend Carey Road (S.R. 1571) from Rouse Road (S.R. 1572)...

R-5727 - Bridges Street Extension

​Preliminary Engineering Activities for this projecthave been suspended.​​​ PROJECT DESCRIPTIONThe Bridges Street Extension project is included in the State Transportation Improvement Program (STIP)...

32
38

U-3431: Widening of Miller Boulevard and N.C. 101 from Lake Road to Outer Banks Drive

​Preliminary Engineering Activities for this projecthave been suspended.PROJECT DESCRIPTION The N.C. Department of Transportation is proposing to widen Miller Boulevard (S.R. 1763) and N.C. 101 (Fontana...


Past Projects

STC Corridor U Master Plan

In 2015, the N.C. Department of Transportation (NCDOT) identified a network of key multimodal transportation corridors called Strategic Transportation Corridors (STC) to support smart planning, help set...

638
155

STC Corridor D Master Plan

In 2015, the N.C. Department of Transportation (NCDOT) identified a network of key multimodal transportation corridors called Strategic Transportation Corridors (STC) to support smart planning, help set...

253
44

I-85 Widening in Gaston County

State Transportation Improvement Program (STIP) Project Nos: I-5719, U-3608, and U-5800 Proposed projects to improve about 10 miles of I-85 from the U.S. 321 interchange (Exit 17) in Gastonia to...

Ferry Long Range Plan

No description yet. Click ''Participate'' to learn more.

1,124
3
complete
complete
Survey - Summer 2019

To promote public understanding of the purpose of and need for the Long-Range Plan. Gather data on stakeholder concerns, needs, wants and ideas to assist with developing the plan.

planned
planned
Results of Survey Published

Results of the survey of stakeholder and customer needs, wants and overall ideas published and the Draft Long-Range Plan will be developed.

planned
planned
Draft Long-Range Ferry Plan Published

A draft document will be provided for public review and comment. At the end of the public comment period on this portion of the plan's development, the plan will be refined and forwarded to the Board of Transportation for adoption.

planned
planned
Long Range Ferry Plan adoption

U.S. 17 Widening, STIP Project Nos. R-2513A and R-3403B

Proposed Widening of U.S. 17 from Antioch Road (S.R. 1433) to Spruill Town Road (S.R. 1438)