BR-0025: Replace Bridge No. 1180 on Meacham Road (S.R. 1639) over I-40 in Statesville
BR-0025: Replace Bridge No. 1180 on Meacham Road (S.R. 1639) over I-40 in Statesville
NCDOT is proposing to replace Bridge No. 1180 on Meacham Road (S.R. 1639) over I-40 in Statesville.
Project Study Area Map
This map is for reference only and is a representation of the general project area.
Project Highlights
The N.C. Department of Transportation proposes to replace Bridge No. 1180 on Meacham Road (S.R. 1639) over I-40 in Statesville. The replacement bridge will include space for a future sidewalk.
The replacement bridge will include space for a future sidewalk. The bridge will be closed during construction and an off-site detour using U.S. 64 (W. Front Street) will be used to cross I-40. It is anticipated that construction will last approximately 12 to 18 months.
Proposed Detour Route
The proposed detour route follows West Front Street to U.S. 64 and then to Northside Drive.
Proposed Typical Section
Note: The 7'-6" space is for a future sidewalk, while the 3' space is for a paved shoulder. At this time, it is unknown whether the future sidewalk will be on the east side (next to the northbound travel lane) or the west side (next to the southbound travel lane) of the bridge.
T
Project Funding
| Estimated Amount* |
Project Development & Design | $ TBD |
Utilities | $ 80,000 |
Property Acquisition | $ 20,000 |
Construction Costs | $ 4,000,000 |
Total Cost | $ 5,500,000 |
* Estimated costs are preliminary and subject to change
Project Timeline
Milestone | Date* |
Environmental Document | Spring 2023 |
Right of Way Acquisition Begins | March 2024 |
Award for Construction | TBD |
* Future dates are preliminary and subject to change
Project Comments
NCDOT accepts comments throughout all phases of project development.
All comments will be taken into consideration, and carry equal weight, regardless of submittal method.
To submit comments for consideration during the current phase of project development,
please submit before May 5, 2023.
The public is encouraged to leave comments using this webpage, email, or phone number:
Email: Meacham-Rd-bridge@PublicInput.com
Phone Number: 984-205-6615 enter project code 2795
Project Contact
Nora McCann, EIT
NCDOT PMU
NCDOT Project Manager
1582 Mail Service Center
Raleigh, NC 27699-1582
Project Contact
Lisa Samples, Ph.D., PE
ms consultants, Inc.
Consultant Project Manager
5444 Wade Park Boulevard, Suite 160
Raleigh, NC 27607
Title VI Feedback
To ensure we’re hearing from a broad set of voices, would you be willing to share (completely anonymously) some information about yourself?
If so, please click here: https://publicinput.com/NCDOT-Title-VI
RESOURCES FOR PROPERTY OWNERS
Although the N.C. Department of Transportation works to minimize the number of homes and businesses displaced by a road project, it is inevitable, in many cases, that a certain amount of private property is needed. The following information explains right of way acquisition and answers questions about the process.
Right-of-Way Brochure Single Page Layout Folleto del Proceso de Adquisición de Bienes Raíces
Right-of-Way Frequently Asked Questions
Right of way Acquisition Process Videos