B-5775: Robinhood Road Bridge over N.C. 67 - Winston Salem
B-5775: Robinhood Road Bridge over N.C. 67 - Winston Salem
The N.C. Department of Transportation proposes to replace the bridge over N.C. 67 (Silas Creek Parkway) in Winston Salem.
Project Study Area and Detour Map
During construction, Westbound turns from Robinhood Road onto N.C. 67 will be prohibited. The yellow dashed line on the map below indicates the recommended southern detour route for this movement. The green line on the map indicates the recommended northern detour route.
Project Overview
The N.C. Department of Transportation is proposing to replace the bridge on Robinhood Road over N.C. 67 in Winston Salem. The project will remove the existing bridge (built in 1963) and replace it with a new bridge. The current bridge is considered structurally deficient.
Structurally Deficient does not mean that the bridge is unsafe. A bridge is Structurally Deficient if it is in relatively poor condition, or has insufficient load-carrying capacity. The insufficient load capacity could be due to the original design or to deterioration.
The proposed bridge will include:
Four 11-foot travel lanes
A 5.5-foot sidewalk on north side
A 5-foot bike lane on north side
A 10.5-foot multi-use path on south side
Staged construction will be used in order to maintain traffic during construction.
Westbound left turn movements onto N.C. 67 will be detoured offsite during construction. Two recommended detours are shown on the map above.
- Yellow - Robinhood Road to Wellington Road to Yorkshire Road to N.C. 67.Silas Creek Parkway Ramp
- Green - Robinhood Rd to Whitaker Ridge Drive to North Peace Haven Road, to Robinhood Road, to N.C. 67/Silas Creek Parkway Ramp
B-5775 Funding
Activity | Estimated Cost * |
Right-of-Way Acquisition | $ 450,000 |
Construction | $ 4.5 Million |
Total Cost | $ 4.95 Million |
*Costs are estimates and subject to change
B-5775 Schedule
Milestone | Date* |
Environmental Document | August 2024 |
Right of Way Acquisition Begins | August 2025 |
Construction Begins | July 2027 |
* Future dates are preliminary and subject to change
Project Comments
NCDOT accepts comments throughout all phases of project development.
All comments will be taken into consideration, and carry equal weight, regardless of submittal method.
To submit comments for consideration during the current phase of project development,
please submit before August 23, 2024.
The public is encouraged to leave comments using this webpage, email, or phone number, or by U.S. Mail to the project managers listed below.
Email: Robinhood-Road-Bridge@publicinput.com
Phone Number: 984-205-6615 enter project code 10467 to leave a message.
Project Contacts
Joel Perlin
NCDOT Project Management Unit
Project Manager
1582 Mail Service Center
Raleigh, NC 27699-1582
Matt Jones, PE
NCDOT Highway Division 9
Project Development Engineer
375 Silas Creek Parkway
Winston-Salem, NC 27127
Title VI Feedback
To ensure we’re hearing from a broad set of voices, would you be willing to share (completely anonymously) some information about yourself?
If so, please click here: https://publicinput.com/NCDOT-Title-VI
RESOURCES FOR PROPERTY OWNERS
Although the N.C. Department of Transportation works to minimize the number of homes and businesses displaced by a road project, it is inevitable, in many cases, that a certain amount of private property is needed. The following information explains right of way acquisition and answers questions about the process.
Right-of-Way Brochure Single Page Layout Folleto del Proceso de Adquisición de Bienes Raíces
Right-of-Way Frequently Asked Questions
Right of way Acquisition Process Videos