P-5720: Durant Road realignment and grade separation - Wake County
P-5720: Durant Road realignment and grade separation - Wake County
NCDOT proposes to realign Durant Road and construct a bridge over the railroad tracks in Wake County.
Interactive Study Area Map:
Project Overview
The N.C. Department of Transportation proposes to realign a 0.65-mile segment of Durant Road, including tying in existing Garvey Drive and Leslieshire Drive, and building a new location access road. This project will also replace the existing railroad crossing with a bridge over the railroad tracks.
Project History
This project was studied under the Southeast High-Speed Rail (SEHSR) project. The initial environmental analysis is covered under the Federal Railroad Administration’s 2015 Final Environmental Impact Statement and 2017 Record of Decision. The NCDOT Rail Division is analyzing the changes thereof to the project design and any potential environmental impacts. A public meeting was held for this project in March 2017.
Proposed Design Changes
The 2017 public meeting maps proposed an access road, north of Durant Road and west of the crossing, as being a cul-de-sac road located directly adjacent to Leslieshire Drive.
Design Change #1: Proposed service access road in the northwest quadrant of the crossing has been redesigned to minimize property impacts.
The 2017 public meeting maps proposed roadway improvements terminate east of Hawksmoor Drive.
Design Change #2: Proposed roadway improvements extend west of Hawksmoor Drive.
The 2017 public meeting maps proposed roadway tie in point east of Capital Hills Drive.
Design Change #3: Revised roadway tie in point to be west of Capital Hills Drive.
Project Map
Click here or on the map image to open the map in a new window for downloading or viewing.
Project Visualizations
Aerial view of project vicinity after completion of bridge and other improvements
Rendering from parking after completion of bridge
Typical Section
Project Funding:
Activity | Estimated Costs* |
Right-of-Way Acquisition | $ 2,450,000 |
Construction Costs | $18,200,000 |
Total Cost | $20,650,000 |
*Estimated costs are subject to change. Based on currently adopted NCDOT State Transportation Improvement Program.
Project Timeline:
Activity | Anticipated Date* |
Public Meeting | 2017 |
Environmental Document | March 2017 |
Construction Award | May 2024 |
Construction Begins | May 2024 |
*Future dates subject to change
Project Comments
NCDOT accepts comments throughout all phases of project development.
All comments will be taken into consideration, and carry equal weight, regardless of submittal method.
To submit comments for consideration during the current phase of project development,
please submit below.
The public is encouraged to leave comments using this webpage, email, or phone number:
Email: Durant-Rd@publicinput.com
Phone Number: 984-205-6615 enter project code 4067
PROJECT CONTACT INFORMATION
Anamika Laad
NCDOT Project Manager
NCDOT Rail Division
1553 Mail Service Center
Raleigh, NC 27699
Title VI Feedback
To ensure we’re hearing from a broad set of voices, would you be willing to share (completely anonymously) some information about yourself?
If so, please click here https://publicinput.com/NCDOT-Title-VI
RESOURCES FOR PROPERTY OWNERS
Although the N.C. Department of Transportation works to minimize the number of homes and businesses displaced by a road project, it is inevitable, in many cases, that a certain amount of private property is needed. The following information explains right of way acquisition and answers questions about the process.
Right-of-Way Brochure Single Page Layout Folleto del Proceso de Adquisición de Bienes Raíces
Right-of-Way Frequently Asked Questions
Right of way Acquisition Process Videos