Interactive Study Area Map:

Project Overview

The N.C. Department of Transportation proposes to replace the bridge on N.C. 24 West (Lejeune Boulevard) over Northeast Creek in Jacksonville, Onslow County. The existing 350-foot westbound bridge would be replaced in-place. Traffic would be maintained with a temporary on-site detour on the existing eastbound bridge during construction. No work will be done on the eastbound bridge. 

The proposed bridge would include three 12-foot travel lanes and 10-foot shoulders on each side replacing the existing bridge in place. 

N.C. 24 West is a rural major collector. In the vicinity of the project N.C. 24 West is 6 lanes divided 3 lanes in each direction and 4-foot shoulders. The posted speed limit on N.C. 24 West is 55 mph.

Built in 1942, the existing bridge is aging and due for replacement. This does not imply that the 82-year-old bridge is unsafe. It means the bridge is reaching the end of its lifecycle and must be monitored, inspected and maintained on a more frequent basis.   

Project Map and Typical Sections

To view or download project map click here or on the map below

 

 

 

Typical Section of Bridge on N.C. 24 West over Northeast Creek

Typical Section of westbound traffic on N.C. 24 West

 

 

 

 

Project Funding:

 Activity

 Estimated Costs*

Right of Way Acquisition 

$  0.75 Million

Utilities

$  0.53 Million

Construction

$   9.6 Million

Total Cost

$ 10.9 Million

*Estimated costs are subject to change. 

Project Timeline:

 Activity

 Date*

Project Newsletter

November 2024   

Environmental document

Winter 2025   

Right of Way Acquisition Begins

    January 2025   

Construction Begins

Summer 2027   

*Future dates subject to change

Project Comments

 

NCDOT accepts comments throughout all phases of project development.  

All comments will be taken into consideration, and carry equal weight, regardless of submittal method.

To submit comments for consideration during the current phase of project development,

please submit before January 6, 2025


The public is encouraged to leave comments using this webpage, email, or phone number:

 

Email: 

Phone Number:  984-205-6615    enter project code 10743

Question title

Would you like to be added to the project email list?

Question title

Please provide any comments or questions regarding the proposed project.

PROJECT CONTACT INFORMATION 

Derek Pielech, PE

Division Bridge Program Engineer

NCDOT Division Highway 3

5501 Barbados Blvd

Castle Hayne, NC 28429

PROJECT CONTACT INFORMATION 

Kent Dickens, PE

Consultant Project Manager

HDR Inc.

555 Fayetteville Street, Suite 900

Raleigh, NC 27601

Title VI Feedback

To ensure we’re hearing from a broad set of voices, would you be willing to share (completely anonymously) some information about yourself?

If so, please click here https://publicinput.com/NCDOT-Title-VI

 

RESOURCES FOR PROPERTY OWNERS 


Although the N.C. Department of Transportation works to minimize the number of homes and businesses displaced by a road project, it is inevitable, in many cases, that a certain amount of private property is needed. The following information explains right of way acquisition and answers questions about the process.  

     
Right-of-Way Brochure Single Page Layout      Folleto del Proceso de Adquisición de Bienes Raíces
Right-of-Way Frequently Asked Questions

Right of way Acquisition Process Videos

English                                                                     Spanish