NCDOT is proposing to upgrade the intersection of N.C. 98 (Holloway Street) and Lynn Road in Durham.
Interactive Study Area Map
This map represents the general location of the project study area for reference purposes.
Project Highlights
NCDOT is proposing to make improvements to the intersection of N.C. 98 (Holloway Street) and Lynn Road in Durham. Improvements include the addition of left turn lanes at the intersection. Additional left turn lanes will require widening of N.C. 98 at the intersection. The graphic below provides information on the planned improvements. These improvements are needed to reduce crashes at the intersection as well as anticipated growth in the area resulting in additional turning volumes.
The typical section for this project was developed to meet the typical section for the adjacent future project (U-6120A), throughout the project corridor. U-6120A would make improvements along N.C. 98 (Holloway Street) between Junction Road and Lynn Road and would include a median, a 10-foot-wide multi-use path, transit stop improvements and a traffic signal where needed.
Project Funding Project Timeline
| Activity | Cost* |
|---|---|
Right-of-Way | $ 500,000 |
Construction | $ 1,785,000 |
Total Cost | $ 2,285,000 |
| Activity | Date** |
|---|---|
Environmental Document | Summer 2025 |
Right-of-Way Acquisition Begins | Fall 2028 |
Construction Begins | Fall 2030 |
* Costs shown are estimates and subject to change
**All future dates are subject to change
Project Comments:
NCDOT accepts comments throughout all phases of project development.
All comments will be taken into consideration, and carry equal weight, regardless of submittal method.
Comments for consideration during the current phase of project development
were to be submitted by March 15, 2025.
The public is encouraged to leave comments using this webpage, email, or phone number:
Email: NC98-Lynn-Durham@publicinput.com
Phone Number: 984-205-6615 and enter project code 3932
Project Contact Information
Mark S. Gallo
Assistant Project Manager
NCDOT Highway Division 5 - Project Delivery
1020 Birch Ridge Drive
Raleigh, NC 27610
Title VI Feedback
To ensure we’re hearing from a broad set of voices, would you be willing to share (completely anonymously) some information about yourself?
If so, please click here: https://publicinput.com/NCDOT-Title-VI-Form
RESOURCES FOR PROPERTY OWNERS
Although the N.C. Department of Transportation works to minimize the number of homes and businesses displaced by a road
project, it is inevitable, in many cases, that a certain amount of private property is needed. The following information explains right
of way acquisition and answers questions about the process.
Right-of-Way Brochure Single Page Layout Folleto del Proceso de Adquisición de Bienes Raíces
Right-of-Way Frequently Asked Questions
Right of Way Acquisition Process Videos