NCDOT proposes to replace the bridge on Buffalo Shoals Road / Hudson Chapel Road (S.R. 1004) over the Catawba River near Statesville, in Catawba and Iredell Counties.
Project Overview
The N.C. Department of Transportation proposes to replace the bridge (No. 480081) on Buffalo Shoals Road/Hudson Chapel Road over the Catawba River. The bridge was built in 1961 and spans the Iredell/Catawba County line.
The purpose of this project is to replace a structurally deficient bridge. While being maintained for safety, the Buffalo Shoals Road Bridge is reaching the end of its functional life and is classified as structurally deficient.
Structurally Deficient does not mean that the bridge is unsafe. A bridge is “Structurally Deficient” if it is in relatively poor condition or has insufficient load-carrying capacity. The insufficient load capacity could be due to the original design or to deterioration.
The project includes replacing the existing structure with a new bridge to the south that includes two, 12-foot travel lanes, two 5-foot bike lanes, and a 5-foot at-grade sidewalk to the north. Traffic will be maintained on the existing bridge during construction of the replacement bridge.
Project Map
Click here or on the map image to open the map in a new window for downloading or viewing.
Typical Sections
Bridge
Approaches to bridge
Project Funding:
Activity | Estimated Costs* |
Project Development & Design | $ 0.9 Million |
Utilities | $ 2.5 Million |
Right-of-Way | $ 1.0 Million |
Construction | $ 20.4 Million |
Total Cost | $ 24.8 Million |
*Estimated costs are subject to change. Based on currently adopted NCDOT State Transportation Improvement Program.
Project Timeline:
Activity | Anticipated Date* |
Right of Way Acquisition Begins | August 2024 |
Construction Begins | Spring 2028 |
*Future dates subject to change
Project Comments
NCDOT accepts comments throughout all phases of project development.
All comments will be taken into consideration, and carry equal weight, regardless of submittal method.
Comments for consideration during the current phase of project development,
were submitted before July 31, 2024
The public is encouraged to leave comments using this webpage, email, or phone number:
Email: Buffalo-Shoals-Bridge@publicinput.com
Phone Number: 984-205-6615 enter project code 1328
PROJECT CONTACT INFORMATION
Nora McCann, EIT
Project Manager
NCDOT Project Management Unit
1582 Mail Service Center
Raleigh, NC 27699-1582
PROJECT CONTACT INFORMATION
Chad Rogers, P.E.
Consultant Project Manager
Parrish and Partners, LLC
6701 Carmel Road, Suite 210
Charlotte, NC 28226
Title VI Feedback
To ensure we’re hearing from a broad set of voices, would you be willing to share (completely anonymously) some information about yourself?
If so, please click here https://publicinput.com/NCDOT-Title-VI
RESOURCES FOR PROPERTY OWNERS
Although the N.C. Department of Transportation works to minimize the number of homes and businesses displaced by a road project, it is inevitable, in many cases, that a certain amount of private property is needed. The following information explains right of way acquisition and answers questions about the process.
Right-of-Way Brochure Single Page Layout Folleto del Proceso de Adquisición de Bienes Raíces
Right-of-Way Frequently Asked Questions
Right of way Acquisition Process Videos