U-5961: N.C. 274 - Osceola Street to Niblick Drive Improvements
U-5961: N.C. 274 - Osceola Street to Niblick Drive Improvements
NCDOT is proposing to improve N.C. 274 (Union Road) from Osceola Street to Niblick Drive in Gastonia.
Interactive Study Area Map:
Project Highlights
The proposed improvements include widening 1.12 miles of N.C. 274 (Union Road) from Osceola Street to Niblick Drive in Gastonia to provide four 12-foot lanes with a 17.5-foot raised grass median. The purpose of this project is to improve traffic mobility and safety on Union Road.
Other improvements include:
- a 10-foot multi-use path on the west side of Union Roa
- a 5-foot sidewalk on the east side of Union Road.
- right in/right out turning movements at Walls Street
- median u-turns and u-turn bulbouts along N.C. 274 (Union Road) between Niblick Drive and Wellons Drive and between Betty Street and realigned Osceola Street / Forest Drive.
- a traffic signal at the intersection of N.C. 274 (Union Road) and realigned Osceola Street / Forest Drive.
The multi-use path was selected due to its ability to accommodate acceptable levels of service for pedestrian and bicyclist users. In addition, it requires less right of way than other separated pedestrian facilities, and costs millions of dollars less than other separated pedestrian facilities.
Public Meeting Map
(Osceola Street to Niblick Drive)
To view or download project map click here or on the map below
Proposed Typical Section
The proposed roadway typical section along N.C. 274 includes four 12-foot travel lanes, a 17.5-foot median, and a 10-foot multi-use path on the west side and 5-foot sidewalk on the east side.
Reduced Conflict Intersections
A Reduced Conflict Intersection – sometimes referred to as a superstreet, a synchronized street, or a median U-turn is a general term used to describe several types of designs that can be used to improve safety and traffic flow on a highway by cutting more than half of the potential locations, or conflict points, where drivers and pedestrians can collide.
The most common type of Reduced Conflict Intersection design eliminates left turns from side roads onto busy main roads. Raised medians direct traffic from the side road into turning right. When there is a safe opening in traffic, drivers enter the flow of traffic on the main route. To go the other direction, or cross the highway, drivers pull into a dedicated lane – typically less than 1,000 feet away – and make a U-turn. There might be a traffic signal at this location.
With a Reduced Conflict Intersection, drivers from the side street only have to be concerned with one direction of traffic on the highway at a time and do not need to wait for a gap in both directions to cross a major road.
Watch a video about how Reduced Conflict Intersections (RCI's) work
Project Funding
| Estimated Cost* |
Right of Way Acquisition | $ 25.5 Million |
Utility Construction | $ 4.1 Million |
Construction | $ 24.0 Million |
Total Cost | $ 53.6 Million |
* Costs are preliminary and subject to change
Project Timeline
Milestone | Date* |
Public Meeting | November 14, 2024 |
Environment Document | Fall 2026 |
Right of Way Acquisition | Summer 2028 |
Construction | Fall 2030 |
* Future dates are preliminary and subject to change
Project Comments
NCDOT accepts comments throughout all phases of project development.
All comments will be taken into consideration, and carry equal weight, regardless of submittal method.
Comments for consideration during the current phase of project development,
were to be submitted by December 4, 2024.
The public is encouraged to leave comments using this webpage, email, or phone number:
Email: nc274-gastonia@publicinput.com
Phone Number: 512-580-8850 enter project code 10647
Project Contact
Bryan Sowell, PE
NCDOT Highway Division 12
Division Project Manager
P.O. Box 47
Shelby, NC 28151
Project Contact
Lisa Feller, PE
Consultant Project Manager
JMT
3508-A Trent Road
New Bern, NC 28562
Title VI Feedback
To ensure we’re hearing from a broad set of voices, would you be willing to share (completely anonymously) some information about yourself?
If so, please click here: https://publicinput.com/ncdot-title-vi-form
RESOURCES FOR PROPERTY OWNERS
Although the N.C. Department of Transportation works to minimize the number of homes and businesses displaced by a road project, it is inevitable, in many cases, that a certain amount of private property is needed. The following information explains right of way acquisition and answers questions about the process.