U-5901: Airport Parkway - Salisbury
U-5901: Airport Parkway - Salisbury
The proposed Airport Parkway project includes constructing a new two-lane roadway
in the vicinity of the Mid-Carolina Regional Airport
between Jake Alexander Boulevard and Peeler Road at U.S. 29.
Your help in gathering data and local information along with your comments on conceptual alignments and potential cross sections is needed.
Please take a few minutes and review the information and questions below and provide as much information as possible.
For additional information on this project, please visit: https://www.ncdot.gov/projects/airport-parkway/ WHERE is the submittal document for this??
Study Area
The project study area, developed to address the Purpose and Need for the Proposed Airport Parkway, is shown in the image below. The proposed study area boundary was created to accommodate potential alternative corridors located along both the western and eastern sides of the Mid-Carolina Regional Airport, as well as to accommodate existing roads that could be utilized for improvements.
Interactive Study Area Map
Project Overview
Planning and development are underway on a proposed road in Salisbury that would stretch from U.S. 70/U.S. 601 (Jake Alexander Boulevard) near Brenner Avenue to the Cedar Springs Road/U.S. 29/Peeler Road intersection.
Known as Airport Parkway, this four-mile road will help improve traffic flow, safety and provide better access to southwest Salisbury, I-85 and the Mid-Carolina Regional Airport.
Airport Parkway will also provide better transportation options for those living and working in the area by providing pedestrian and bicycle accommodations.
Project Highlights
The proposed Airport Parkway project by the N.C. Department of Transportation includes building a two-lane road, near Mid-Carolina Regional Airport, between Jake Alexander Boulevard and Cedar Springs Road/Peeler Road at U.S. 29.
Eight Detailed Study Alternatives have been identified as described below for further evaluation. NCDOT is currently conducting environmental, design, and traffic studies for each of the detailed study alternatives. Environmental studies are scheduled to be completed in 2026.
Project Purpose and Need
The purpose of the proposed action is to improve roadway network connectivity between Jake Alexander Boulevard (US 70/US 601) and Cedar Springs Road/Peeler Road within the proposed study area, thereby providing improved access to the Mid-Carolina Regional Airport and surrounding residential and commercial development.
Factors contributing to the need of the project include:
• Lack of connectivity on the roadway network in the proposed study area.
• Poor access to the Mid-Carolina Regional Airport and surrounding development.
• Poor intersection level-of-service along the roadway network within the proposed study area, including Jake Alexander Boulevard (U.S. 70/U.S. 601), U.S. 29 (S. Main Street), and N.C. 150. EXPLAIN LOS
Project History
The N.C. Department of Transportation first completed a feasibility study for the proposed Airport Parkway project in 1998. The project was then included in the CRMPO 2050 Metropolitan Transportation Plan (March 2022) and the City of Salisbury Forward 2040 Comprehensive Plan (February 2023).
The project is listed in the NCDOT State Transportation Improvement Program as Project No. U-5901.
Preliminary engineering activities for this project resumed in 2023. Project Alternatives are being evaluated to identify the Least Environmentally Damaging and Practicable Alternative (LEDPA) to carry forward to final design.
Project Funding
Activity | Estimated Cost* |
Right of Way Acquisition | $ 19.6 Million |
Utilitiy Relocation | $ 7.9 Million |
Construction | $ 52.1 Million |
Total Cost: | $ 79.6 Million |
* Esttimated costs, based on currently adopted State Transportation Improvement Program (STIP)
Project Schedule
Milestone | Date* |
Environmental Document | January 2026 |
Right of Way Acquisition Begins | July 2030 |
Award for Construction | January 2034 |
* All future dates subject to change
Project Contact | Project Contact |
Ryan Newcomb | Eric Midkiff, PE |
Division Project Engineer | Consultant Planning Managaer |
NCDOT Highway Division 9 | NV5 |
375 Silas Creek Parkway | 3300 Regency Parkway - Suite 100 |
Winston-Salem, NC 27127 | Cary, NC 27518 |
Project Comments
NCDOT accepts comments throughout all phases of project development.
All comments will be taken into consideration, and carry equal weight, regardless of submittal method.
To submit comments for consideration during the current phase of project development,
please submit before December 5, 2025
The public is encouraged to leave comments using this webpage, email, or phone number:
or mailed to the project contacts at the addresses listed below.
Email: airportparkway-Salisbury@publicinput.com
Phone Number: 984-205-6615 enter project code 2820 to leave a message