U-5744: U.S. 70/N.C. 50 at Timber Drive/Hammond Road
U-5744: U.S. 70/N.C. 50 at Timber Drive/Hammond Road
PROJECT DESCRIPTION
The N.C. Department of Transportation is proposing to upgrade the U.S. 70/N.C. 50 at-grade intersection with Hammond Road (S.R 2026)/Timber Drive (S.R. 2812) in Garner. The proposed intersection upgrade is located in Garner (Wake County), near the southern edge of Raleigh. This project is included in the State Transportation Improvement Program (STIP) as Project No. U-5744.
This project will be reprioritized for funding in the next State Transportation Improvement Program. A schedule for right of way, utilities and/or construction has not been finalized at this time. However, preliminary engineering activities (design, planning, studies) needed for project development are underway.
Interactive Vicinity Map
ABOUT THE PROJECT
State Transportation Improvement Program (STIP) No. U-515 was a project developed and constructed in the 1990’s to extended Hammond Road on new location from Grovemont Road (S.R. 2720) to Rush Street (S.R. 2683). The project originally proposed to construct an interchange at the intersection of U.S. 70/N.C. 50 and Hammond Road Extension. Due to lack of available funding at the time, the construction of the interchange was eliminated from consideration.
This intersection project was recently re-programmed and funded to complete needed improvements at the intersection as STIP No. U-5744.
ESTIMATED COSTS
Activity | Estimated Cost* |
Right of Way Acquisition and Utilities | $ 921,000 |
Construction Costs | $ 14,400,000 |
Total Cost | $ 15,321,000 |
* Estimated Costs as shown in currently adopted 2020-2029 STIP and are subject to change
TIMELINE
Milestone | Date* |
---|---|
Public Meeting #1 | March 2018 |
Environmental Document Complete | November 2018 |
Preliminary Design Complete | December 2018 |
Right of Way Acquisition Begins | TBD |
Construction Begins | TBD |
* Future dates as shown in Currently adopted 2020-2029 STIP and are subject to change
PUBLIC INVOLVEMENT
NCDOT accepts throughout all phase of project development. The NCDOT project team reviews all feedback – regardless of how it is submitted (online, phone, email, or letter) – and explore options to incorporate comments and address concerns where and when feasible.
PUBLIC MEETINGS
A public meeting was held on March 27, 2018 to present information on the project.
PUBLIC MEETING MAPS
Alternative 1: Continuous Flow Intersection Click Here
Alternative 2: Single Point Urban Interchange Click Here
What is a Continuous Flow Intersection? (Alternative 1)
The Continuous Flow Intersection concept is an unconventional intersection concept whose goal is to reduce the number of conflicting movements at the main intersection in order to allow for more green time for the major street through traffic.
The Continuous Flow Intersection removes the conflict between left-turning vehicles and through traffic in the opposite direction by crossing the left-turn traffic to the left side of the roadway.
The crossing from the right side to the left side is accomplished at a midblock signalized intersection for each approach that will include the continuous flow lanes.
Visualization of Continuous Flow Intersection on U.S. 70/N.C. 50 at Timber Drive/Hammond Road
Watch a Youtube Video of how this type of intersection operates:
What is a Single Point Urban Interchange? (Alternative 2)
A Single-Point Urban Interchange (SPUI) is a type of interchange where a single set of traffic signals at the center of the interchange controls all left turns.
SPUI's
- can be constructed where there would not be room for a standard interchange
- can allow more vehicles to make a turn and clear the interchange in one traffic signal cycle
- allows long, gradual turns so larger vehicles have more room to navigate
In this case, Timber Drive/Hammond Road would be carried over U.S. 70/N.C. 50 via a bridge. Timber/Hammond travelers would have an unobstructed, non-stop flow
Left and right turn movements from Hammond/Timber as well as to Timber/Hammond would be controlled by a signal at the new intersection beneath the bridge.
Visualization of Single Point Urban Interchange on U.S. 70/N.C. 50 at Timber Drive/Hammond Road
Watch a Youtube Video of how this type of interchange operates:
COMMENTS/QUESTIONS
Comments may be submitted via phone, email, or U.S. Mail to the individual listed below. All comments received carry equal weight, regardless of submittal method. All comments will be reviewed and suggestions/recommendations incorporated into designs where feasible.
PROJECT CONTACT INFORMATION
John Braxton |
Project Manager |
NCDOT Division 5 |
jwbraxton@ncdot.gov |
919-707-6219 |
1020 Birch Ridge Drive Raleigh, NC 27610 |
RESOURCES FOR PROPERTY OWNERS
Although the N.C. Department of Transportation works to minimize the number of homes and businesses displaced by a road project, it is inevitable, in many cases, that a certain amount of private property is needed. The following information explains right of way acquisition and answers questions about the process.
Right-of-Way Brochure Single Page Layout Folleto del Proceso de Adquisición de Bienes Raíces
Right-of-Way Frequently Asked Questions
Right of way Acquisition Process Videos