BR-0026: Replacement of Bridge No. 50 on N.C. 210 over Middle Creek
BR-0026: Replacement of Bridge No. 50 on N.C. 210 over Middle Creek
Preliminary Engineering Activities for this project
have been suspended.
The N.C. Department of Transportation proposes to replace Bridge No. 50 on N.C. 210 over Middle Creek in Johnston County. The purpose of the project is to replace a structurally deficient bridge, which means it has one or more defects that require attention.
Bridge No. 50 will be replaced with a new bridge at its existing location. Traffic will be detoured offsite during the construction period. The offsite detour for this project would include N.C. 210, Crantock Road (S.R. 1504), Cleveland Road (S.R. 1010), and Swift Creek Road, and would result in approximately 14 minutes of additional travel time (10 miles additional travel). Construction will take approximately 8 months.
El Departamento de Transporte Carolina del Norte propone reemplazar el Puente No. 50 en N.C. 210 sobre Middle Creek en el Condado de Johnston. El propósito del proyecto es reemplazar un puente que es estructuralmente deficiente, que significa que tiene uno o más defectos que requieren atención.
El puente No. 50 será reemplazado con un nuevo puente en su ubicación existente. El tráfico será desviado durante el período de construcción. El desvío incluiría N.C. 210, Crantock Road (S.R. 1504), Cleveland Road (S.R. 1010) y Swift Creek Road, y resultaría en aproximadamente 14 minutos de tiempo de viaje adicional (10 millas de viaje adicional). La construcción demorara aproximadamente 8 meses.
Vicinity Map:
Project Schedule* / Cronograma del Proyecto*:
| Date / Fecha |
---|---|
Right-of-Way Begins (Comienza la Adquisicición del Derecho de Paso) | March 18, 2022 (18 marzo 2022) |
Let Date (Comienza la Construcción) | April 18, 2023 (18 abril 2023) |
* Future dates are preliminary and subject to change
*Las fechas futuras son preliminares y están suetas a cambios
NCDOT Needs Your Input! / ¡NCDOT Necesita Sus Aportaciones!
Your answers will help NCDOT accommodate your needs during the construction of the new bridge on N.C. 210. *The comment period is now closed.*
Sus respuestas ayudarán a NCDOT a incorporar a sus necesidades durante la construcción del nuevo puente en N.C. 210. *Ahora el período de comentarios está cerrado.*
Project Team Member / Miembro del Equipo del Proyecto:
David Stutts, P.E.
NCDOT Project Manager
1581 Mail Service Center
Raleigh, NC 27699-1581
(919) 707-6442
dstutts@ncdot.gov
Project Team Member / Miembro del Equipo del Proyecto:
Paul Garrett, P.E.
Consultant Project Manager
3509 Haworth Drive, #100
Raleigh, NC 27609
(919) 977-9455
tpgarrett@VaughnMelton.com
RESOURCES FOR PROPERTY OWNERS
Although the N.C. Department of Transportation works to minimize the number of homes and businesses displaced by a road project, it is inevitable, in many cases, that a certain amount of private property is needed. The following information explains right of way acquisition and answers questions about the process.
Right-of-Way Brochure Single Page Layout Folleto del Proceso de Adquisición de Bienes Raíces
Right-of-Way Frequently Asked Questions
Right of way Acquisition Process Videos