Project Overview

The N.C. Department of Transportation proposes to widen I-85 in Gaston County from U.S. 321 (Exit 17) in Gastonia to N.C. 273 (Exit 27) in Belmont/Mt. Holly, about 9.8 miles. To complete the widening and improve traffic operations and safety, the majority of the bridges over I-85 will need to be replaced as part of this project.

In addition, STIP Project U-5800 is also being studied and included in the environmental documentation of I‑5719. STIP Project U-5800 proposes improvements to the intersection of N.C. 7 (South Main Street) and U.S. 29/74 (Wilkinson Boulevard) in Belmont.

The purpose of the proposed improvements to I-85 is to reduce congestion and improve mobility in this growing area of Gaston County. The primary needs to be addressed by STIP Project No. I-5719 are the existing and projected lack of capacity and outdated roadway design on the I-85 corridor. This results in frequent congestion and delays limiting east-west mobility. The congestion is a contributing factor to increased crash incidents.

The primary need for the improvements to the intersection of North Main Street and Wilkinson Boulevard is to alleviate congestion and improve safety at the intersection. The primary purpose is to improve traffic operations and safety at the intersection.

Project Study Area Map

This map is for reference only and is a representation of the general project area.

I-5719 U-5800 Project Vicinity Map

 

Project  Overview Video

 

Project Highlights

The proposed project will widen the existing interstate mainline from six to eight lanes. An additional through-lane in each direction of I-85 is proposed for a total of four through-lanes in each direction. Auxiliary lanes will also be constructed in select locations. Auxiliary lanes are continuous lanes between two interchanges to help traffic flow, especially when interchanges are closely spaced.

Since there is not enough clearance to widen I-85 under most of the existing bridges and interchanges, the majority of roadway and railroad bridges over I-85 will be replaced as part of I-5719. Eleven roadway bridges and four railroad bridges will be replaced. Most interchanges will also be redesigned to improve traffic operations. All bridges over I-85 will be replaced utilizing phased construction or a temporary detour bridge except Groves Street in Lowell.

The U.S. 29/74 (Wilkinson Boulevard) and N.C. 7 (N. Main Street) intersection in Belmont will be converted to a reduced conflict intersection (RCI). Corridors with growing traffic volumes and high crash rates, like North Main Street and Wilkinson Boulevard, are good candidates for a RCI design. RCIs function by cutting more than half of the potential conflict points where drivers, pedestrians, and/or bicyclists can collide. 

A video of RCIs can be viewed below.

Project History

Initial project coordination and concept development for the proposed I-85 Widening project began in 2016. Technical studies began in 2017 to identify potential impacts to the human and natural environment and inform development of preliminary roadway designs. Public meetings were held in May 2019 to present design concepts and gather public input. In September 2019, the I-5719/U-5800 project was placed on hold due to statewide transportation funding constraints. The project was restarted and suspended again in 2020, before restarting the project development process in January 2021. Since the restart in 2021, NCDOT has worked with local stakeholders and regulatory agencies to select the best design option while considering public input and complying with the National Environmental Policy Act (NEPA).

STIP Project U-3608, improvements to North Main Street (N.C. 7) from I-85 to U.S. 29/74 in Belmont was previously included with STIP Projects I-5719 and U-5800. However, due to the relocation of the Belmont Mt Holly Road interchange with I-85 and the reconfiguration of N.C. 7 and Main Street, U-3608 is now included as part of I-5719.

These projects are expected to be constructed via the design‐build process. Design‐Build is a contracting process that brings designers and contractors together to expedite construction, enhance innovation and/or reduce costs. Once the design‐build team of designers and contractors is selected and under contract, they will be responsible for the final design, necessary environmental regulatory permits, right of way acquisition, and construction of the project. The team may begin construction while they finish the design and right of way acquisition, resulting in faster project completion.

These projects are listed as Projects I-5719 and U-5800 in the N.C. Department of Transportation’s State Transportation Improvement Program and are funded for $635 million.

Project Funding

 

I-5719 Cost*

U-5800 Cost*

Utilities

$    71.1 Million

$   3.6 Million

Property Acquisition

$    10.5 Million

$   2.4 Million

Construction

$  422.8 Million

$   4.4 Million

Total

$ 624.4 Million

$10.4 Million

* Costs are preliminary and subject to change

Project Timeline

Milestone

Date*

Public Meeting 1

May 2019

Public Meeting 2

August 2022

Environmental Document+

March 2024

Right-of-Way Acquisition

June 2024

Begin Construction

March 2026

* Future dates are preliminary and subject to change; +anticipate Federal CE

Project Webpage

For information about the project such as estimated costs, schedule, and maps, please visit our project webpage:
www.ncdot.gov/projects/i-85-widening-gaston-county

Project Comments

NCDOT accepts comments throughout all phases of project development.  
The public is encouraged to leave comments using this website, email, or phone number

Comments to be considered during the current phase of project development were to be submitted by Sept. 23, 202121.

Email: I-85widening@PublicInput.com

Phone Number: 512-580-8850 enter project code 5194

Question title

Would you like to be added to the project mailing list? Please provide your email address.

Question title

Do you have any questions or comments regarding either the I-85 Widening project or the Improvements to the North Main Street and Wilkinson Boulevard Intersection in Belmont?

Closed for Comments

Title VI Feedback

To ensure we’re hearing from a broad set of voices, would you be willing to share (completely anonymously) some information about yourself?

If so, please click here: https://publicinput.com/NCDOT-Title-VI

Project Contact

Nora McCann, EIT

NCDOT Project Manager

NCDOT Project Management Unit

1595 Mail Service Center

Raleigh, NC 27699

I-85widening@PublicInput.com

512-580-8850  code 5194

Project Contact

Kat Bukowy, AICP

Consultant Project Manager

HNTB

343 E. Six Forks Road, Ste. 200

Raleigh, NC 27609

I-85widening@PublicInput.com

512-580-8850  code 5194

RESOURCES FOR PROPERTY OWNERS 

Although the N.C. Department of Transportation works to minimize the number of homes and businesses displaced by a road project, it is inevitable, in many cases, that a certain amount of private property is needed. The following information explains right of way acquisition and answers questions about the process.  

     
Right-of-Way Brochure Single Page Layout      Folleto del Proceso de Adquisición de Bienes Raíces
Right-of-Way Frequently Asked Questions

Right of way Acquisition Process Videos

English                                                                     Spanish